Previous Topic: How to Use this GuideNext Topic: Multisystem Planning


System Setup

This chapter describes the system, tape management, and third party setup to successfully implement CA Vtape.

This section contains the following topics:

Multisystem Planning

Multisystem Requirements

Reserves and Enqueues

JES3 Requirements

Define Virtual Devices Using IBM's Hardware Configuration and Definition (HCD) Dialogs

Work Load Manager (WLM) Considerations

APF Authorizations

DASD Allocation Control Products

Saving the Logger Data

Tape Management System Considerations

VTA08NON Job to Allocate Non-SMP/E Data Sets

Oracle Host Software Component (HSC) and Storage Management Component (SMC)

Integration with CA OPS/MVS