Previous Topic: Setting CA Top Secret Control OptionsNext Topic: CICS FACILITY Facility Suboption Implementation Types


CICS FACILITY Designation Types

There are two designation types that indicate when a suboption takes effect. These designation types are:

Dynamic

Takes place immediately.

After CICS Recycle

Takes effect only after CICS recycle. These options include:

The tables in CA Top Secret Features Suboptions, CICS SIT Facility Override Suboptions, Bypass List Suboptions, and Protect List Suboptions show the designation type for each suboption.