The distributed compliance reports that have a RESOURCE control statement also have a PREFIX control statement.
Specifies the type of value that was provided in the RESOURCE parameter. If the PREFIX parameter value is set to Y (yes), the RESOURCE parameter value is treated as a prefix and matches any resource entity in the repository that begins with the RESOURCE value or a corresponding mask. If the PREFIX parameter value is set to N (no), the RESOURCE parameter value is treated as a full resource name and only matches resource entities in the repository for the full resource name or a corresponding mask.
|
Copyright © 2013 CA Technologies.
All rights reserved.
|
|