Previous Topic: Nucleus MessagesNext Topic: Virtual Printer Messages


Cleanup Messages

ESF200

*** ESF RESOURCE CLEANUP xxxxxxxx FOR tp jjjjjjjj.ssssssss.pppppppp ***

Reason:

The CA Spool interface-cleanup module has performed resource cleanup for job jjjjjjjj, step ssssssss, proc-step pppppppp, where tp is JS for job-step cleanup or ST for subtask cleanup. The cleanup may have been COMPLETED or FAILED (xxxxxxxx). Processing continues.

Action:

None, but it may be necessary to abnormally terminate CA Spool, when it is to be stopped, if the cleanup has failed.

ESF201

*** ESF RESOURCE CLEANUP FAILED FOR ADDRESS SPACE xxxx, CODE y ***

Reason:

The CA Spool interface-cleanup processing has failed, and a simple resource cleanup for address space xxxx (hex) has been performed. If code y is T, the error occurred during execution of the end-of-task clean-up routine. If code y is X, the ESTAE routine has been invoked during execution of the end-of-task cleanup routine. Processing continues.

Action:

Notify your systems programmer. Note that CA Spool will probably have to be terminated using the ABEND command or the OS cancel command instead of the SHUTDOWN command.

ESF202

*** ESF RESOURCE CLEANUP COMPLETE FOR ADDRESS SPACE xxxx ***

Reason:

The CA Spool interface-resource-cleanup module has successfully completed resource cleanup for failing address space xxxx. Processing continues.

Action:

None, but note that CA Spool will probably have to be terminated using the ABEND command or the OS cancel command instead of the SHUTDOWN command.

ESF250

SVC DUMP SCHEDULED FOR JOB jjjjjjjj STEP ssssssss

Reason:

A communication interface IRB running under a user TCB has abnormally terminated, and an SVC dump has been scheduled for the terminating request block. The user TCB under which the IRB was executing is abnormally terminated.

Action:

None.

ESF251

SVC DUMP SCHEDULED FOR TERMINATING APPLICATION

Reason:

Same as message ESF250 except that the termination routine was unable to obtain a work area in which a complete message could be built. Same as message ESF250.

Action:

None.

ESF252

TERMINATION COMPLETE FOR xxxxxxxx OPENED BY jjjjjjjj

Reason:

CA Spool has completed termination processing for communication channel xxxxxxxx, which was opened by job jjjjjjjj. Processing continues.

Action:

None.

ESF253

TERMINATION IN PROGRESS FOR xxxxxxxx OPENED BY jjjjjjjj

Reason:

The CA Spool resource cleanup has initiated termination for communication channel xxxxxxxx, which was opened by job jjjjjjjj. The communication channel is closed, and processing continues.

Action:

None.