

Installation and Upgrade Guides › Directory Configuration Guide › Critical Path inJoin Directory Server › Sample User Directory Settings--Critical Path InJoin Directory Server
Sample User Directory Settings--Critical Path InJoin Directory Server
The following are sample user directory settings:
Directory Setup
- Namespace: LDAP
- Server: 123.456.7.8
- Root: o=companyname, c=us
- DN Lookup Start: (cn=
- DN Lookup End: )
Credentials and Connection
- Admin Username: cn=manager
- Admin Password: ********
User Attributes
- Universal ID (R): cn
- Disabled Flag (RW): description
- Password Attribute (RW): userpassword
- Password Data (RW): audio
- Challenge/Response (RW): jpegPhoto
Note: User attribute names in DMS are or are not case-sensitive on an attribute-by-attribute basis.
Copyright © 2012 CA.
All rights reserved.
 
|
|