You configure the project launch settings to specify where the Sample connector should start.
Follow these steps:
The Debug Configurations dialog opens.
The right pane is populated with the TestNG configuration information.
The Project Selection dialog opens.
SampleConnector displays in the Project field.
The TestNG dialog opens.
The class displays in the Class field.
The project launch settings are configured. Complete Steps 9-11 to run a unit test.
The unit test runs.
The unit test results display.
The execution results report displays in HTML format. All tests pass if the environment is configured correctly.
|
Copyright © 2013 CA.
All rights reserved.
|
|