Once the main cost pools have been defined, a total cost of each cost pool can be calculated. First, the activities related to each cost pool are identified and assigned to the appropriate cost pool. To properly trace the expenses to each cost pool, cost drivers have to be identified for each cost element.
To assign a cost element to a cost pool
Copyright © 2013 CA.
All rights reserved.
|
|