To override a global value for one report, issue the command before the END command for that report.
Example, to override the set GLOBAL EACH 2 HOURS within a report, specify the report command EACH 4 HOURS with the commands for that report.
|
Copyright © 2012 CA.
All rights reserved.
|
|