Specifies the date when to determine eligibility for processing subsequent branches in the process.
Click the Calendar icon to open the calendar and select a date. This option is unavailable if you select either the Use current date or the Use calculated date check box.
Specifies the date that the process is run to determine eligibility for processing subsequent branches in the process.
Clear this check box to specify a particular date in the Date field. This check box is initially selected.
Returns a date. This expression lets you use the CA Process Automation date variables and functions to return a date.
If Use calculated date is selected, this parameter specifies an expression that returns a date. Typical uses include calculating a future date based on the current date.
Specifies a time in a 12-hour HH:MM PM/AM format.
For example: 07:30 PM
Creates a date-time wait condition. This property delays processing of subsequent operators in a branch of the process until the specified time. Only exit links designated to occur after (>) the specified time are processed.
Clear this check box to divert processing to different branches before or after the specified date and time. The operator imposes the following conditions when the Wait for specified date and time check box is cleared:
If the specified date and time are in the future, only exit links specified to be processed before (<) are processed.
|
Copyright © 2014 CA.
All rights reserved.
|
|