

Preparing to Start Your Product › Complete Installation Checklist › Test Complete CA PanAPT System › Test Plan
Test Plan
Because each site has its own testing procedures and standards, you must decide what to test and how to test. The following is a list of general guidelines for developing a test plan:
- Define Move Requests with many different members and Library Codes. Include various combinations of members and Library Codes.
- Define a large group of Move Requests, all to be moved at the same time.
- Perform the batch jobs that physically move the members. Study all reports and verify that all CA PanAPT status updates are correct.
- Use the Modeling Facility. Modify copies of the supplied models and write your own to perform some of your site's unique processing requirements for member movement into production libraries.
- Use the Retrieve Facility. Modify copies of the supplied Retrieve models. Write models of your own to meet your site's unique requirements.
- Run all of the reports. Specify all parameters for each report.
When you complete your testing and are satisfied that CA PanAPT is working as documented, you have completed the installation.
You are now ready to begin using CA PanAPT to move members into your production libraries.
Copyright © 2010 CA.
All rights reserved.
 
|
|