Enter data as required on this panel and press ENTER. The panel is processed, and you return to the panel you came from (the Move Request Maintenance panel or the Browse Move Requests List panel).
Note: If the Move Request only moves up one level (such as from a starting test level to a quality assurance level) and no further, the Final Move date overlays the Next Move date at this time.
|
Copyright © 2004 CA.
All rights reserved.
|
|