The Process Selected Move Requests Job (APJJ5320) uses the CA‑PanAPT Modeling Facility to create the JCL and control statements required to perform the actual movement into the QA libraries. It also uses the Member Posting Utility program (APCS5391) at various points to post the status of individual members being moved.
You can set any of the following flags for each member of a Move Request:
The member is to be moved as part of APJJ5320 processing. Movement may or may not have begun and is not yet complete.
A Model has indicated that External Processing is required for the member outside of APJJ5320.
External Processing has started for the member.Any combination of M, E, or S can be set for a member. After movement begins, a Move Request in APQ status is changed to Awaiting QA Move (AMQ) status. It remains in AQM status as long as at least one member still has the M flag set on.
As members are successfully moved into QA, their M flags are set to off. When all members in a Move Request have had their M flags set to off, the Member Posting Utility (APCS5391) changes the status of the Move Request from AWQ to one of the following:
The Move Request is being moved to the QA level. All member moves done as part of APJJ5320 have completed, but some of the members require external processing that has not completed. Some members have E flags or S flags, but all M flags have been removed.
All M, E, and S flags have been removed from members. All APJJ5320 processing and external processing is complete for this stage. The Move Request has been moved to the QA level and includes at least one library code that requires Approvals or a Verification procedure to be run.
This indicates that the Move Request has been moved to the QA level. All M, E, and S flags have been removed from members. All APJJ5320 processing and external processing is complete for this stage. No Approvals or Verification procedures are required for a move into Production.
This indicates the Move Request was moved to the QA level. There were no more levels, either because QA was the last level used by any of the Library Codes participating in the Move Request, or because the Early Stop Level was set to QA. Processing is complete for this Move Request. All M, E, and S flags have been removed from the members.
The created JCL controls the actual movement of the entities. The JCL steps copy the entities from the Test to the QA Libraries, and then (depending on how the Library Code is set up) delete the copy on the Test Libraries.
At the end of APJJ5320, PROC APJP5395 updates the status of all Special Handling Move Requests to Complete. Note that Special Handling Move Requests have no members to move, so they are not updated by any of the member‑processing steps. APJP5395 also produces several summary reports. Report APCS5395‑01 lists the status of each Move Request that was originally selected. Report APCS5395‑02 lists the Library Codes in which processing did not complete normally (according to the return codes in the JCL).
|