Previous Topic: The Effect of the Action Verification SettingNext Topic: Drop a Node Without Confirmation


Confirm the Drop

When you enter the P command and the Action Verification field is set to Y, a confirmation panel appears to enable you to cancel the drop operation. Following is a sample panel:

AOF CTRL - Display Global Variables -------- MSI1 ------------ Subsystem OPSS COMMAND ===> NOTE: You are about to drop a node. If you press ENTER the node will be reset back to its default value (i.e. the variable name itself). The name of the node to be dropped is: GLOBAL.JES2.PRT4 Enter END command to cancel the drop operation.

From this panel you can either: