Important! Do not proceed with this step until ReportCenter's HFS directory is implemented and permanently mounted. If it is not, your installation jobs fails. Run the installation jobs on a system that has this HFS mounted for read/write access.
To submit the ReportCenter Installation JCL
Note: Do not proceed with any job until the previous job completes successfully. Each job should return condition code 0 unless otherwise indicated.
The SMP/E data sets are allocated.
The SMP/E data sets are initialized with ReportCenter's SYSMOD details, DDDEFs, paths, and so on.
ReportCenter is SMP/E received. This job requires tape processing if installing from tape.
ReportCenter is SMP/E applied. This job populates the HFS target library (TLIB).
ReportCenter is SMP/E accepted. The SMP/E distribution library (DLIB) for the HFS target library is a z/OS data set.
The Install Utility Primary Menu appears.
| Copyright © 2012 CA. All rights reserved. |
|