Load library for MIM must be a PDS
Reason:
CA MIM has determined that one of the data sets specified on the STEPLIB DD statement is not a standard PDS. CA MIMis unable to proceed, and terminates with ABEND U40, reason 168.
Action:
Rebuild the CA MIM load library as a standard PDS, then restart CA MIM.
| Copyright © 2012 CA. All rights reserved. | Tell Technical Publications how we can improve this information |