Previous Topic: Chart View #2 - CPU TimeNext Topic: Chart View #4 - Response Time


Chart view #3 – WLM Response Goal Met

Each chart image generated with Chart View #3 displays the percentage of web requests that met or exceeded their WLM response time goal at the SYSID level (CSV data extract 1), the Web Server level (CSV data extract 2), and the Request Type level (CSV data extract 3).

In all cases, the percentage met is shown using vertical bars. The left y axis is scaled from 0 to 105 so that a 100% WLM Response goal met percentage bar height ends near the top of the chart viewing area. Additionally, a horizontal reference line is displayed indicating a 90 percent response goal met value, and the request count is displayed using a horizontal line and the right y axis.

The level of detail provided by Chart View #3 for each of the three CSV data extracts is similar to that described above for Chart View #1. For the specific information provided with Chart View #3 charts in each CSV data extract, refer to the DATA EXTRACTS section below.

The second chart sample above is an example of Chart View #3, generated by the 30 Day Web Server Analysis Web Server by DAY CSV data extract (2). This chart sample shows 30 days of the WLM response time goal met percentage for synchronous transactions processed by web server CAD314W. This server is hosted on SYSID XAD1, a z/OS LPAR running on an IBM 2827-615 (zEC12 CPC with 15 sub-capacity CP engines). You can see that consistently, about 95 percent of the synchronous requests processed by this web server met their WLM response time goal.