The Job Input Queue Time Report, shown in Figure 3-3, is a set of plots, one for each class, showing both the actual and simulated queue times. The queue times are shown as cumulative distributions; the data points for the actual and simulated data are overlaid on the same plot.
JOB INPUT QUEUE TIME REPORT 21:58 THURSDAY, NOVEMBER 19, 1987 ACTUAL QUEUE TIME = A SIMULATED QUEUE TIME = _ JOB CLASS=B PLOT OF JOB_AQTM*ACT_DONE SYMBOL USED IS A PLOT OF JOB_SQTM*SIM_DONE SYMBOL USED IS _ | | | 4:51:40 + | | | A 4:10:00 + I | N | P | U 3:28:20 + T | | A Q | U 2:46:40 + E | U | E | 2:05:00 + _ T | _ I | M | _ E 1:23:20 + | | AAAAAA | __ | _ 0:41:40 + __ | AAA | _A | _____________________________________________________________________________________AA 0:00:00 + AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA -+---------+---------+---------+---------+---------+---------+---------+---------+---------+--------+---- 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0 100.0 PERCENTAGE OF JOBS SELECTED NOTE: 1 OBS HAD MISSING VALUES 167 OBS HIDDEN
Figure 3-3. Sample Job Input Queue Time Report
REPORT OPTIONS The fields available on the Batch Initiator Simulation inquiry panel, which is shown Figure 3-11, determine the content of the information in the report. The Inquiry panel and field descriptions is documented in Section 3.1.6. DATA ELEMENTS The elements that create the report heading are documented in Section 3.1.3.1, Common Report Elements. The report plots the range of input queue times for the class against the percentage of jobs that arrived for that class. This means that a point on the plot maps a given input queue time value to the percent of jobs that had an input queue time of that value or less. For example, in the report shown in Figure 3-3, 100 percent of the simulated queue times were 2:05:00 or less.
|
Copyright © 2014 CA.
All rights reserved.
|
|