

Appendix B. QUICK START TUTORIAL › B.1 Quick Start Tutorial for CPU Planning › B.1.4 Build Presentation Graphics
B.1.4 Build Presentation Graphics
The following procedure documents the required steps for
creating charts from CA MICS Capacity Planner database
history, forecast and worksheets.
1. Choose Option 2 or Capacity Planning Analysis from the
Capacity Planner main screen.
2. Insert a new inquiry and choose Workload Forecasting.
Enter the name of the analysis here: ____________.
3. Choose 6 for Presentation Graphics.
4. Specify the following:
a. Specify the Original file used in the previous sections
of this Quick Start Tutorial.
b. Specify Y for Worksheets.
c. Use Color only if you have host graphic support
available on your system.
5. Execute the inquiry (See Figure B-7).
--------------------------- Presentation Graphics ----------------------------
|Command ===> |
|Enter a ? in any data entry field for more information on valid values. |
|Composing CA MICS Inquiry: CPUM1 - Actual vs. Forecast CPU |
| |
|Report title ===> CPU: Actual vs. Forecast (by Month) |
| |
|Selection criteria |
| Input file ===> QC1 - Quick Start |
| Start date ===> _________ (ddmonyyyy) |
| SYSID ===> XAD1 |
| Zone ===> 1 |
| No. months ===> 12 (1-9999) |
| Specify CAPAPU Values ===> N (Y/N) |
| |
|Data element ===> CPUPCBSY |
|Previous forecast date ===> _________ (ddmonyyyy) |
|Y-Axis label ===> Pct Processor Busy |
|Plot type ===> COLOR (COLOR/PRINTER) |
|Include Worksheets ===> Y (Y/N) |
| |
|Specify extended options ===> N (Y/N) |
| |
---------------------------------------------------------------------------------
Figure B-7. Presentation Graphics Control Screen
Copyright © 2014 CA.
All rights reserved.
 
|
|