Figure 7-17 shows the Model Analysis Report for the channel 5
I/O data. Note that the value of r-squared is a reasonable
0.75. The F value of 30.84 appears to be large and the
p-value associated with this F is 0.0004, which is very
small. You can interpret this p-value as the probability
that you would have estimated this model, given that the data
was purely random, and that no linear relationship truly
exists. The p-value says that there are no more than four
chances in 10,000 that these estimates would arise due to
random error.
The model that is shown in the report is in the following
form:
CHAN5CNT = 9736797 + 587938 * T1
In this model, T1 is the number of the month and CHAN5CNT is
the monthly total I/O count for channel 5. This model
indicates that you can expect I/O loads to rise by about
588,000 I/Os each month.
CA MICS Capacity Planner ANALYSIS OF UNIVARIATE FORECASTING MODEL MODEL OF: CHAN5CNT BASED ON: LINEAR ------------TIME ELEMENTS------------ R**2 F P INTERCEPT NAME COEFFICIENT T P -------- ------- ----- --------- -------- ----------- ------- ----- 0.75 30.84 .0004 9736797 LINEAR 587938 5.55 .0004
Figure 7-17. Extended Example Model Analysis Report
|
Copyright © 2014 CA.