Previous Topic: 6.2 Usage GuidelinesNext Topic: 6.3.1 CSV Creation for CA MICS Q&R Reporting


6.3 Standard Output


Simple Regression Analysis produces plots that track both the
historical data and the least squares trend line over time.
Forecasted future values of the trend line are represented.
Using Simple Regression Analysis screens, you can control the
number of forecast intervals, the axis titles, and the plot
title.

Additionally, Q&R formatted CSV files can be optionally
produced for later use by the CA MICS Q&R product. The
optional CSV file creation is discussed in chapter 7.

Figure 6-1 is a sample simple regression forecast plot that
shows the historical data, trend, and forecast for the SIO
count on channel 1.  The data is taken from the 4381- 2 I/O
workload analysis case study, which was originally developed
in Section 3.3.3.1.  The contents of this graph are defined
using the Simple Regression Analysis screen (see Figure 6-3).

The following is a description of the title information:

o  A user-specified title.  In this example, EXTENDED
   EXAMPLE.

o  A second user-specified title.  In this example, CHANNEL 1
   SIO COUNT VS MONTH.

o  A title line generated by the program.  This line contains
   the SYSID and ZONE that you selected for inclusion in the
   analysis.

o  A blank line.

o  The next three lines of the title are generated by the SAS
   PROC PLOT for printer plots.  They are not included on
   color graphics plots.  These lines are:

   -  Designation of the historical observations

   -  Designation of the regression values that
      correspond to the historical observation

   -  Designation of the forecasted values

o  Y-axis title line.  The Y-axis of the plot shows the
   range of values associated with the historical
   observations and the predicted values.  You may
   specify the label for this axis.

o  X-axis title line.  The X-axis of the plot shows the
   range of dates that correspond to the historical data
   and the predicted values.  The program generates the
   label for this axis.

EXTENDED EXAMPLE CHANNEL 1 SIO COUNT VS MONTH SYSID: TSO1 ZONE: 1 PLOT OF CHAN1CNT*DATE LEGEND: A = 1 OBS, B = 2 OBS, ETC. PLOT OF PX*DATE SYMBOL USED IS * PLOT OF EST*DATE SYMBOL USED IS + 15000000 + A A 14000000 + + C 13000000 + + H + A + N + + 1 12000000 + * * S * I A A * * O * 11000000 + A C * * O * A A U * N A * T 10000000 +* A A A 9000000 + A 8000000 + -+----------+----------+----------+----------+----------+----------+----------+----------+----------+ 30SEP97 30NOV97 31JAN98 31MAR98 31MAY98 31JUL98 30SEP98 30NOV98 31JAN99 31MAR99 MONTH ENDING


 Figure 6-1.  Simple Regression Forecast Plot