Continuing the System Workload and Performance Profile case study introduced in Section 3.3.3.5 and continued in Section 6.6.3, Presentation Graphics was used to produce a printer plot of the forecast of multiprocessor CPU busy that was developed. Figures 4-14 and 4-15 show the control parameters used to produce the report. Figure 4-16 shows the printer plot produced by Presentation Graphics.
--------------------------- Presentation Graphics --------------------------- |Command ===> | |Enter a ? in any data entry field for more information on valid values. | |Composing CA MICS Inquiry: WKLPLT - CPU Utilization Plot | | | |Report title ===> HISTORY OF MULTIPROCESSOR CPU UTILIZATION FOR SYSID TS01 | | | |Selection criteria | | Input file ===> WKL - System Workload Example | | Start date ===> _________ (ddmonyyyy) | | SYSID ===> TSO1 | | Zone ===> 1 | | No. months ===> (1-9999) | | Specify CAPAPU Values ===> N (Y/N) | | | |Data element ===> CPUMPBS | |Previous forecast date ===> _________ (ddmonyyyy) | |Y-Axis label ===> PCT CPU BUSY | |Plot type ===> PRINTER (COLOR/PRINTER) | |Include Worksheets ===> N (Y/N) | | | |Specify extended options ===> Y (Y/N) | | | ------------------------------------------------------------------------------- Figure 4-14. System Workload Study Control Parameters --------------------------- Extended Options Menu --------------------------- |Command ===> | | | |Inquiry Step: Presentation Graphics | | | |Description text: | | ===> PLOT OF MODEL DEVELOPED IN SECTION 7.6.3____________________ | | ===> ____________________________________________________________ | | ===> ____________________________________________________________ | | ===> ____________________________________________________________ | | ===> ____________________________________________________________ | | ===> ____________________________________________________________ | | | |Override color graphics format parameters ===> N (Y/N/R) | | Color graphics format set ===> PENPLOT | | | |Specify Y-axis reference (capacity) lines ===> N (Y/N/R) | ------------------------------------------------------------------------------- Figure 4-15. System Workload Study Extended Options
SYSID: TSO1 ZONE: 1 HISTORY OF MULTI-PROCESSOR CPU UTILIZATION FOR SYSID TSO1 ------------------------------------------------------------------------------------------------------------------------------ 100-| | | | | | HISTORY/ | | FUTURE | | | | | | | * | 75-| * | U U U U U P | * * |U U U+ + + + + + C | * * * * * |L+L+L L L L L L T | * * * * * * * * | | * * | C | * * * * * | P | * | U | | 50-| | B | | U | | S | | Y | | | | | | | | 25-| | | | | | | | | | | | | | | | 0-|-------------------------------------------------------------------------------------------------------- 0 2 0 1 0 1 3 1 2 1 2 0 2 0 2 0 1 0 1 2 1 2 1 2 0 2 8 2 5 9 3 7 1 4 8 1 5 9 3 6 0 4 8 1 5 9 2 6 2 6 9 3 M M J J J J J A A S S O O N N D D J J J F F M M A A A A U U U U U U U E E C C O O E E A A A E E A A P P Y Y N N L L L G G P P T T V V C C N N N B B R R R R 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 9 9 9 9 9 9 9 9 9 WEEK ENDING +---------LEGEND---------+ |* HISTORY | |+ FORECAST | |W WORKSHEET FORECAST | -------------------------USER DESCRIPTION------------------------- |P PREVIOUS FORECAST | PLOT OF MODEL DEVELOPED IN SECTION 7.6.3 |U UPPER CONF LIMIT | |L LOWER CONF LIMIT | |= USER LIMIT | || HISTORY/FUTURE LINE | +------------------------+
Figure 4-16. Presentation Graphics Report for the System Workload Case Study
|
Copyright © 2014 CA.
All rights reserved.
|
|