3. CAPACITY PLANNING DATABASE › 3.3 Resource Element Files › 3.3.3 Resource Element File Case Studies › 3.3.3.2 Performance Group/Period Workload Tracking › 3.3.3.2.1 Problem Description
3.3.3.2.1 Problem Description
The following chart represents the workloads that were
defined to the model:
WORKLOAD PERFORMANCE GROUPS AND/OR PERIODS
==================== =====================================
1 - Period 1 TSO Performance Group 2 Period 1
2 - Period 2 TSO Performance Group 2 Period 2
3 - Period 3 TSO Performance Group 2 Period 3
4 - Period 4 TSO Performance Group 2 Period 4
5 - Period 5 TSO Performance Group 2 Period 5
6 - Development TSO Performance Group 7
7 - JES Performance Group 62
8 - Overhead All Other Performance Groups
Although the analytic model was validated for the period
selected, there are still two other questions that must be
answered:
o Is the selected day representative of the same time
periods on other days?
o How can the workload transaction arrival rates be expected
to grow in the future?
A resource element file was used to collect 12 weeks of data
from ZONE 1 (Monday through Friday prime shift) for the
workload. You can compare these values to the transaction
counts reported for the modeled interval to see if the
modeled interval is similar to the historical data. (Later in
this document, we show how you can use the workload
forecasting program to estimate the future values of the
workload transaction arrival rates.)