1. OVERVIEW › 1.5 Online Facility Tutorial › 1.5.2 Getting Started with the Online Facility › 1.5.2.2 Starting the Online Facility
1.5.2.2 Starting the Online Facility
Start the online facility by selecting it from the CA MICS
Workstation Facility (MWF) menu. The method of reaching the
CA MICS Workstation Facility varies from installation to
installation.
There are two common ways to start MWF. Your CA MICS System
Administrator may have installed CA MICS so that you can
reach MWF by selecting an option on your installation's ISPF
primary option menu or another ISPF menu.
If you cannot start MWF from a standard ISPF menu, ask your
CA MICS System Administrator for the name of the MWF CLIST.
If neither of these methods works, ask your CA MICS System
Administrator to tell you how to start MWF.
More information on starting up and using MWF is contained
in the PIOM.
Regardless of how you start MWF, once you select the options
that bring you to the Capacity Planner Management Support
Application, you will see the screen shown in Figure 1-2.
/----------------------------- Capacity Planner -----------------------------\
|Option ===> |
| |
| |
| 0 - MICF Options |
| Review/modify MICF parameters and default options. |
| 1 - Capacity Planning Data Base Files |
| Define, modify, or update capacity planning data base files. |
| 2 - Capacity Planning Analysis |
| Define, modify, or update capacity planning analyses. |
| 3 - Capacity Planner Worksheet Facility |
| Create, input, and produce capacity planning worksheets. |
| 4 - Capacity Planning Facilities Administration |
| Maintain shared capacity planning data base files. |
| 5 - Reports and Graphics |
| Review reports and graphics from inquiries and production jobs. |
| 6 - Production Reporting Administration |
| Add, modify, execute, or delete MICF inquiry production jobs |
| or Capacity Planner production update jobs. |
| T - Tutorial |
| X - Exit |
| |
| |
| |
| |
| |
\------------------------------------------------------------------------------/
Figure 1-2. Capacity Planner Menu
For more detailed discussions on the Capacity Planner screen
options, refer to the following sections of this guide or
other CA MICS documentation:
o For Option 0, MICF Options, refer to the CA MICS MICF User
Guide and to sections 1.5.2.3 and 1.5.9 of this guide.
o For Option 1, Capacity Planning Database Files, refer to
Section 1.5.3 and Chapter 3 of this guide.
o For Option 2, Capacity Planning Analysis, refer to Section
1.5.4 and Chapters 4 through 11 of this guide.
o Option 3, Capacity Planner Worksheet Facility, refer to
Section 1.5.8 of this guide.
o Option 4, Capacity Planning Facilities Administration,
refer to Section 1.5.8 and Chapter 8 of this guide.
o For Option 5, Reports and Graphics, refer to Section 1.5.5
of this guide or to the CA MICS MICF Reference Guide.
o For Option 6, Production Reporting Administration, refer to
Section 1.5.7 of this guide or to the CA MICS MICF
Reference Guide.
Copyright © 2014 CA.