2. PERFORMANCE REPORTING ANALYSIS › 2.4 I/O Configuration Analysis › 2.4.7 Tape Drive Simulation Analysis Inquiry › 2.4.7.4 Component Operation › 2.4.7.4.6 Move Workload Observations Panel
2.4.7.4.6 Move Workload Observations Panel
You can use the optional Move Workload Observations panel to
model the effect of moving workloads which allocate tape
drives to a different time period.
Jobname: The name of the job whose movement to a
different time period is to be modeled. This is
the name of an actual job whose data is included
in the data being analyzed.
Old Start The time (expressed to an accuracy of hundredths
Time: of a second) at which this actual job was read
into the system. The high level of accuracy for
this timestamp is required to ensure that the
modeling procedure will be able to match this
control statement with the correct job.
New Start The time to which the modeling procedure is to
Time: move this job.
/-------------------------- Move Workload Observations -------------------------\
| Command ===> Scroll ===> CSR |
| |
| Inquiry Step: IOA Tape Drive Simulation Analysis |
| Report date: 01DEC87 Report hours: 18 - 23 |
| |
| Line Cmds: I Insert D Delete C Copy M Move R Reset |
| |
| Old Start Time New Start Time |
| Cmd Jobname (hh : mm : ss . th (hh : mm : ss . th) |
| - -------- -- -- -- -- -- -- -- -- |
| _ ________ __ : __ : __ . __ __ : __ : __ . __ |
| _ ________ __ : __ : __ . __ __ : __ : __ . __ |
| _ ________ __ : __ : __ . __ __ : __ : __ . __ |
| _ ________ __ : __ : __ . __ __ : __ : __ . __ |
| _ ________ __ : __ : __ . __ __ : __ : __ . __ |
| ****************************** BOTTOM OF DATA ******************************** |
| |
| |
| |
| |
\-------------------------------------------------------------------------------/
Figure 2-158. Move Workload Observations Panel