2. PERFORMANCE REPORTING ANALYSIS › 2.4 I/O Configuration Analysis › 2.4.7 Tape Drive Simulation Analysis Inquiry › 2.4.7.4 Component Operation › 2.4.7.4.5 Add Workload Observations Panel
2.4.7.4.5 Add Workload Observations Panel
You can use the optional Add Workload Observation panel to
model the effect of adding workloads which allocate tape
drives.
The following fields are used on the Add Workload
Observations panel:
*Jobname: The job name you have chosen for this workload.
This name must begin with an asterisk (*) to
avoid any possible confusion with an actual job
being analyzed.
Start Time: The time at which this simulated workload begins
using tape drives.
End Time: The time at which this simulated workload
finishes using tape drives.
Tapes The number of drives that this simulated
Needed: workload will require.
Warning: A flag to indicate that a previously defined
added workload is no longer within the report
hour range (e.g., the report hour range was
changed on the main panel).
/-------------------------- Add Workload Observations --------------------------\
| Command ===> Scroll ===> CSR |
| |
| Inquiry Step: IOA Tape Drive Simulation Analysis |
| Report date: 01DEC87 Report hours: 18 - 23 |
| |
| Line Cmds: I Insert D Delete C Copy M Move R Reset |
| |
| Start Time End Time Tapes Needed |
| Cmd *Jobname (hh : mm : ss) (hh : mm : ss) (1-99) Warning |
| - -------- -- -- -- -- -- -- -- ------------ |
| _ * __ : __ : __ __ : __ : __ __ |
| _ * __ : __ : __ __ : __ : __ __ |
| _ * __ : __ : __ __ : __ : __ __ |
| _ * __ : __ : __ __ : __ : __ __ |
| _ * __ : __ : __ __ : __ : __ __ |
| ****************************** BOTTOM OF DATA ******************************** |
| |
| |
| |
\-------------------------------------------------------------------------------/
Figure 2-157. Add Workload Observations Panel