For this case study, we used the DASD Multiple Volume Analysis Report to analyze 16 volume serial numbers for mapping on eight dual density devices. The volume serial numbers were PACK01, PACK02, PACK03, XXXACC, XXXACT, BSDIS1, BSDIS3, BSDIS4, BSDL03, BSDS01, BSDS02, BSDS05, BSDS06, BSDL05, FERC01, and BSDIS4. The time period was from 7:00 a.m. to 6:00 p.m. each day for the past three days. The CA MICS database containing the installation's hardware data was denoted by database identifier B. The inquiry fields for the study are shown in Figures 2-120 and 2-121.
/------------------- IOA DASD Multiple Volume Analysis Report ------------------\ | Command ===> | | | | Composing CA MICS Inquiry: IOA39 - Volume Grouping Analysis Case Study | | | | Time-span ===> DAYS (DETAIL/DAYS) Cycle(s) ===> 01 - 03 | | Data base ===> B (PRIMARY) _ _ _ _ | | Allow Run-Time Override of Data Base ===> N (Y/N) and/or Cycle(s) ===> N (Y/N) | | | | Num of VOLs to be combined ===> 2 (2/3/4) Plot contention index ===> Y (Y/N) | | | | Volume table method: ** Specified ** : Least active method: | | Analyze or Monitor ===> A (A/M) : Device type ===> _____ (3350/3380) | | Analyze unlike VOLs ===> N (Y/N) : Num of VOLs ===> ___ (1-100) | | Specify volume table ===> Y (Y/N/R) : | | | | Data Selection: Allow run-time override | | Date ===> _______ - _______ _______ - _______ ===> N (Y/N) | | Hour ===> 07 - 18 __ - __ __ - __ ===> N (Y/N) | | Zone ===> _ _ _ _ _ _ _ _ _ ===> N (Y/N) | | Sysid ===> ____ ____ ____ ____ ____ ____ ===> N (Y/N) | | | | Specify extended options ===> N (Y/N) | | | \-------------------------------------------------------------------------------/ Figure 2-120. Case Study - DASD Multiple Volume Analysis Report Inquiry Panel /-------------------------- Volume Serial Number Table -------------------------\ | Command ===> | | | | Inquiry Step: IOA Multiple DASD Volume Analysis | | | | Volume serial numbers (Max 100 in any order) | | ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ | | PACK01 PACK02 PACK03 XXXACC XXXACT BSDIS1 BSDIS3 BSDIS4 BSDL03 ______ | | BSDS01 BSDS02 BSDS05 BSDS06 BSDL05 FERC01 BSDIS4 ______ ______ ______ | | ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ | | ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ | | ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ | | ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ | | ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ | | ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ | | ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ | | ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ | | | | | | | | | | | | | \-------------------------------------------------------------------------------/
Figure 2-121. Case Study - VOLSERs Selected for IOA DASD Multiple Volume Analysis Report
The DASD Multiple Volume Analysis Report produced by the inquiry panels shown above is provided in Figure 2-122. The corresponding DASD Contention Index Plot is provided in Figure 2-123. The volume serial numbers of the suggested pairing are presented in the plot report subtitle. The volumes are PACK02 and XXXACC.
CA MICS Performance Manager
DASD MULTIPLE VOLUME ANALYSIS
INTERVAL START: 27DEC88:07:44
INTERVAL END : 04JAN89:17:59
DURATION : 31:00:00
SYSIDS : SYSA SYSB SYSC
DEVICE DEVICE AVERAGE MAXIMUM
VOLSER1 TYPE1 VOLSER2 TYPE2 PRODUCT SUM
------- ------ ------- ------ ------- -------
BSDIS3 3380 BSDL05 3380 0.01 1.86
BSDS02 3380 BSDS05 3380 0.01 1.33
BSDIS1 3380 BSDS01 3380 0.03 2.42
BSDIS4 3380 BSDS06 3380 0.05 4.58
PACK01 3380 BSDL03 3380 0.06 2.33
PACK03 3380 FERC01 3380 2.52 9.48
PACK02 3380 XXXACC 3380 65.90 50.31
Figure 2-122. Case Study - IOA DASD Multiple Volume Analysis Report
CA MICS Performance Manager >> SUM1PCBS: VOL1 BUSY + VOL2 BUSY WHEN BOTH ARE >0 << >> SUM2PCBS: VOL1 BUSY + VOL2 BUSY << >> SUM1PCBS>100 ==>100, SUM2PCBS>100 ==>110 << PACK02 /XXXACC PLOT OF SUM1PCBS*HOUR LEGEND: A = 1 OBS, B = 2 OBS, ETC. PLOT OF SUM2PCBS*HOUR SYMBOL USED IS * SUM1PCBS | | | 80 + | | 70 + | | 60 + | | 50 +A | | 40 + | A A | A A 30 + A A | A | 20 + A A A | A A | A A A A 10 + B A B |A A |A A A 0 + A B A B | | | -+----------+----------+----------+----------+----------+----------+----------+----------+----------+ 8 9 10 11 12 13 14 15 16 17 HOUR OF DAY
Figure 2-123. Case Study - Plot of DASD Contention Index