Appendix E. PSP ONLINE PANEL FLOW AND DIALOG › E.3 Option 1 - Problem Analysis › E.3.4 Change Status › E.3.4.2 Status of Product Change
E.3.4.2 Status of Product Change
_______________________________________________________________________________
-------------------------- Status of Product Change ----------- ROW 1 OF 68
Command ===> _ Scroll ===> PAGE
=> ACT4202 Installation Accounting Component support for the DB2
Status: UNAPPLIED -
Line Cmds: S Select member status B Browse CA MICS member
Cmd Member Action Library
- -------- --------- --------------------------------------------
_ COSTRTE REPLACED sharedprefix.MICS.HOLD.PARMS
_ ELEMTBL REPLACED sharedprefix.MICS.HOLD.PARMS
_ RTBLDB2 ADDED sharedprefix.MICS.HOLD.PARMS
_ RTBLIDMA ADDED sharedprefix.MICS.HOLD.PARMS
_ RTBLIDMC ADDED sharedprefix.MICS.HOLD.PARMS
_ RTBLIMSF ADDED sharedprefix.MICS.HOLD.PARMS
_ RTBLMAZ ADDED sharedprefix.MICS.HOLD.PARMS
_ RTBLTSOC ADDED sharedprefix.MICS.HOLD.PARMS
_ RTBLTSOI ADDED sharedprefix.MICS.HOLD.PARMS
_ RTBLTSOU ADDED sharedprefix.MICS.HOLD.PARMS
_ RTBLVCA ADDED sharedprefix.MICS.HOLD.PARMS
_ RTBLVMC ADDED sharedprefix.MICS.HOLD.PARMS
_ #DBMACT UPDATED sharedprefix.MICS.SOURCE
_ ACTAUDPT UPDATED sharedprefix.MICS.SOURCE
_______________________________________________________________________________
Status of Product Change panel (PSPSCHG)
Processing Notes:
1) Status can be:
UNAPPLIED
SELECTED
APPLYING - YY/MM/DD HH:MM - BY userid
APPLIED - YY/MM/DD HH:MM - BY userid
SUPERSEDED - YY/MM/DD HH:MM - BY cccnnnn
2) You can specify another change by keying over the change number.
3) The first product change found in the status table is displayed
if a change number was not entered on the menu option line.
The Status of Product Change panel reviews the libraries and
members affected by a product change. It displays a list of
the members (by member name within library name) altered by a
selected product change. This process can be entered from
the Change Status menu or by selecting a product change from
the Status of Component display. The change being processed
is specified following the => prompt; a new product change
can be viewed by entering its ID here.