The Weekly Batch Job Initiation Report quantifies the total
batch activity on an hourly basis for each identified day and
computing system for the previous week.
Figure 3-20 illustrates a sample report. The horizontal axis
represents the hour of the day and the day. The vertical
axis charts the number of batch jobs initiated that received
the service indicated -- E for exceeded, H for hit, and M for
missed. The management objective is shown by the dashed
horizontal reference line printed across the chart.
In Figure 3-20 the reference line is shown at the 100 job
level of the vertical axis. Therefore, any hour for which
the charted bar falls below this reference line signals that
the total batch job initiation objective was missed for that
hour.
The following user option applies to this report:
o Daily Jobs Initiated - the target and maximum number
of jobs submitted per hour. The target amount is used
for a reference line on the graph and the maximum is
used to set the maximum value on the graph's vertical
axis.
The SAS MACROs _SMFJSAX and _SMFPTR define the vertical axis
maximum scaling and reference line for the number of jobs
initiated by hour in the daily and weekly reports.
MACRO _SMFJSAX 240 %
MACRO _SMFPTR 100 %
A full description of the user options is provided in Section
3.3.4, Running the Batch Management Objective Reports.
CA MICS 23:01 THURSDAY, MARCH 23, 1989 WEEKLY BATCH MANAGEMENT OBJECTIVES BATCH JOB INITIATION OBJECTIVE OF 100 PER HOUR SYSTEM IDENTIFICATION=R033 JOBCOUNT SUM 240 + | | M | H 210 + H | M H | M M H | M H H M M H 180 + M H H H M H H H | H M H H H M H H H MM H | H M H HH HM H M E HHHH HH H | H H M H HH HHM H H MH EMHHHHH HHHHH 150 + H H H HHHH HHH H H MMH EHHHHHH HHHHH | HHH EHH HHEH EHH H H MMMH EHEHHEH HHHHH | HHHHEHHM MHHEH EHH EMH MMHH EHEHHEHH HHHHH | EEHHEHHH HEHEE EHE HEMEMHHHH EHEHEEHH EHEHE 120 + EEHHEEHH HEHEE EEE EEHEHHHHH EHEEEEHHM EEEEE | EEEEEEHH EEEEEE EEE EEHEHHHHH EEEEEEEHH EEEEE | EEEEEEHH EEEEEE EEE EEHEHHHHH EEEEEEEHH EEEEE |-----------------EEEEEEEE-----EEEEEE-EEE-----EEEHEHHHHE------EEEEEEEEH-----E-EEEEE------------------ 90 + HEEEEEEEE EEEEEE EEE EEEHEHHHEE EEEEEEEEE EEEEEEE | EEEEEEEEE EEEEEE EEE EEEEEEEEEE EEEEEEEEE EEEEEEE | EEEEEEEEE EEEEEEHEEE EEEEEEEEEE EEEEEEEEE EEEEEEE | E EEEEEEEEE EEEEEEHEEE EEEEEEEEEE EEEEEEEEE EEEEEEE 60 + E EEEEEEEEE EEEEEEHEEE EEEEEEEEEE EEEEEEEEE EEEEEEE | E EEEEEEEEEE EEEEEEEEEE EEEEEEEEEE EEEEEEEEEE EEEEEEE EE | E E EEEEEEEEEE EEEEEEEEEE EEEEEEEEEE EEEEEEEEEE EEEEEEE EEH | E EEE EEEEEEEEEE EEEEEEEEEE EEEEEEEEEE EEEEEEEEEE EEEEEEE E EEE 30 + EE EEEE EEEEEEEEEE EEEEEEEEEE EEEEEEEEEE EEEEEEEEEE EEEEEEE E EEEE | EEEEEEE EEEEEEEEEE EEEEEEEEEE EEEEEEEEEE EEEEEEEEEE EEEEEEE H EEEEEEEE | EEEEEEE EEEEEEEEEE EEEEEEEEEE EEEEEEEEEE EEEEEEEEEE EEEEEEEH E E EEEEEEEE |EE EEEEEEE EEEEEEEEEE EEEEEEEEEE EEEEEEEEEE EEEEEEEEEE EEEEEEEE E EEEEEEEEEE ---------------------------------------------------------------------------------------------------------------- 11111111 11111111 11111111 11111111 11111111 11111111 11111111 8901234567 8901234567 8901234567 8901234567 8901234567 8901234567 8901234567 HOUR 12MAR89 13MAR89 14MAR89 15MAR89 16MAR89 17MAR89 18MAR89 REPTDATE SYMBOL SERVICE SYMBOL SERVICE SYMBOL SERVICE E EXCEED H HIT M MISS
Figure 3-20. Weekly Batch Job Initiation Report
| Copyright © 2012 CA. All rights reserved. | Tell Technical Publications how we can improve this information |