Previous Topic: 8. INSTALLATION

Next Topic: 9.1 Processing Considerations

9. PROCESSING


This chapter describes the daily processing flow of the CA
MICS Analyzer Option for VM/CMS, the exit points available in
the DAILY update, and considerations for running the VM DAILY
update.

This section contains the following topics:

9.1 Processing Considerations

9.2 Analyzer Daily Update Flow

9.3 DAY080 Physical Structure

9.4 Daily Update Physical Structure

9.5 Account Physical Structure

9.6 VM Monitor Processing Physical Structure