|
Possible Cause |
Possible Solution |
|---|---|
|
Insufficient quota |
Try increasing BYTLM and/or PQL BYTLM |
The following conditions determine the run time for a job:
Jobs run when the specified scheduler is accessible AND
OR
OR
| Copyright © 2012 CA. All rights reserved. | Tell Technical Publications how we can improve this information |