This exit, used as an Exit 3, matches run date (yymmdd format). Change it to yy/mm/dd, and place the weekday in blank spaces (output data element 99).
If the date in the control field is not a valid date, no changes are made. Therefore, at least one of the specified sort control fields should be a valid six-character date field.
| Copyright © 2012 CA. All rights reserved. |
|