Previous Topic: BATCH Charges

Next Topic: System Requirements


TSO Charges

  1. The Total Charge is calculated as:
    Total Charge = Processor Charge + I/O Charge
                   Connect charge +
                   UR Charge
    
  2. The Processor Charge is computed as follows (same method as for batch):
    Processor Charge = Processor Time x
                       Adjusted Rate
    
  3. Processor Time is calculated as follows:
    Processor Time = (Active Time x
                     Active Time Factor) +
                     (Total CPU Time x
                     Total CPU Time Factor)
    
  4. The Adjusted rate is computed the same as described earlier for batch.
  5. The I/O Charge is calculated the same as described earlier for batch.
  6. Connect Charge for TSO sessions is computed as follows:
    Connect Charge = Connect Time x
                     Connect Time Factor
    
  7. The Unit Record Charge allows for chargeback against terminal activity. It is computed as follows:
    UR Charge = ((TPUTS x TPUT-TGET-Rate) +
                 (TGETS + TPUT-TGET-Rate)) / 1000