System Use Reporting › Interpreting Reports › Report Headings
Report Headings
The header portion of each of these reports contains the following elements:
- The report title.
- The report run date.
- The page number (a four-digit, zero-suppressed value). The page number starts over at 1 for each selected report.
- The exact date/time range covered by the report. Note that for multiday recaps of shift oriented reports, the period covered includes only the appropriate shift on all days.
- These three items appear only on reports for which shift and date boundaries can vary:
- The scope of the report. See the description of scope as it applies to each report.
- The first logical date covered by the report.
- The last logical date covered by the report. If it is blank, the report covers only one day.
Note: The logical date covered by the report is the date on which the 24-hour period starts.
|
Copyright © 2012 CA.
All rights reserved.
|
|