Customizing symbolic information saves your monitoring configuration for future reuse and is optional. To customize symbolic information required for testing composite modules, submit a batch job to run IN25LINK.
Note: For more information about how to use the IN25LINK program, see the Symbolic Guide.
The CA InterTest for CICS batch job step, executed after the composite module is link‑edited, reads the link‑edit map to determine the link‑name, offset, and length of each subprogram. This step also specifies the names under which CA InterTest for CICS monitors each program.
To monitor each subprogram as if it were a separate load module, enable composite module monitoring.
Follow these steps:
The Program Monitoring Menu opens.
Note: It is not necessary to enter information for the subprograms that you do not plan to test separately.
|
Copyright © 2015 CA Technologies.
All rights reserved.
|
|