The following table shows you where you are in the installation process:
You Are Here |
Step in Installation Process |
---|---|
X |
1. Install prerequisite hardware and software and configure your system as required. |
|
2. Perform one of these installations:
|
|
3. (Optional) Create separate databases. |
|
4. (Optional) Install the Report Server. |
|
5.(Optional) Install alternate Provisioning Directories, alternate Provisioning Servers, and connector servers to support the failover and load balancing. |
Copyright © 2013 CA.
All rights reserved.
|
|