Previous Topic: Oracle Applications PrerequisiteNext Topic: Oracle Applications Limitations


OS/400 Migration Steps

To migrate from the C++ OS/400 connector to the Java OS/400 connector, you must do the following:

Once this has been done, all types of operations can be executed against the existing OS400 endpoints seamlessly.