Reason:
In the PLAN RESOURCE section, a line of the fill-in contains a non-blank version number, but no program-name was specified.
Action:
If the version-number was entered in error, erase the version number. If the program-name was unintentionally omitted, enter the program name.
|
Copyright © 2015 CA Technologies.
All rights reserved.
|
|