Reason:
The CA Datacom/DB Multi-User Facility (MUF) is not available. Either MUF was not started or it was terminated. This has caused a failure of the CA Ideal PLTI task that loads the in-core table of load modules. Neither the task nor CA Ideal runs without MUF in service.
Action:
Bring MUF back into service using appropriate techniques from CA Datacom/DB. You can, at this point, also recycle the CICS partition to reinvoke the CA Ideal PLT task. If not, use the CICS service facility to RESTART any URTs the MUF failure closed. The building of the PLT in-core table is performed when a user first successfully signs on and enters a RUN command. This could cause a lengthy pause between the time the first user presses Enter and the time the user obtains a response from CA Ideal.
|
Copyright © 2015 CA Technologies.
All rights reserved.
|
|