Previous Topic: Integration with CA IDMS/DBNext Topic: General Architecture


Implementation

To implement CA IDMS VSAM Transparency, follow these steps:

  1. Prepare the database by following the procedures detailed in CA IDMS Database Administration Guide.
  2. Transfer data from VSAM files to the CA IDMS/DB database by using the CA IDMS VSAM Transparency migration utility. This utility is described in Runtime Operations.
  3. Prepare the control tables that will be used by CA IDMS VSAM Transparency at runtime. Instructions on preparing control tables are presented in Preparing Control Information.
  4. Modify the application JCL. Sample JCL is presented in Chapter 5, Runtime Operations.