

Data Description Phase › Steps of the Data Description Phase › Step 4—Prepare the Logical CA IDMS/DB Database
Step 4—Prepare the Logical CA IDMS/DB Database
In this step you prepare generator control statements. These statements describe the logical component of the CA IDMS/DB database (the schema and subschema).
Detailed information for each generator control statement is presented in the next section.
The control statements and the Total DDL statements you prepared in step 2 are used to:
- Produce a complete schema description that reflects the Total database
- Produce complete subschema descriptions that reflect the Total database
- Build the loader module (ETOTLOAD); ETOTLOAD contains the information necessary to establish correspondence between the structure of the unloaded Total database and that of the CA IDMS/DB database
- Build a runtime control table (ETOTTBL); ETOTTBL replaces the Total DBMOD; ETOTTBL contains information that associates database requests in Total programs with the appropriate CA IDMS/DB data descriptions and relationships
Note: After you code the control statements you can move on to the next transparency phase (see Database Conversion Phase).
Copyright © 2013 CA.
All rights reserved.
 
|
|