The following is a description of the various fields which make up the ACTIVITY Report.
PERIOD - Start and stop date/time intervals.
START (BGIN) - Number of run units initiating activity within the reported time interval.
COMMIT (COMT) - Number of recovery unit checkpoints issued by run units activated within the reported time interval.
FINISH (ENDJ) - Number of recovery units activated within the reported time interval which terminated successfully.
ABORT (ABRT) - Number of recovery units activated within the reported time interval which terminated abnormally.
ACTIVE - Number of run units active within the time interval. When both ONL and BTC run units are present, an ACTIVE count is reported for the TOT summary line only.
Note: The value of ACTIVE can exceed the value of START if run units were active at the start of the current time interval.
DURATION (SEC)
Processing Type - Online (ONL), Batch (BTC), or total (TOT). When both ONL and BTC run units are present within a time interval, a TOT summary line is produced.
MAXIMUM CONCURRENT RUN UNITS - Highest quiesce level encountered in a BGIN archive record within the reported time interval.
The following example shows the Activity Report:
ID RELEASE CA IDMS JOURNAL ANALYZER DATE TIME PAGE Rnn.nn ACTIVITY REPORT mm/dd/yy hh:mm:ss 2 PERIOD START COMMIT FINISH ABORT ACTIVE ---------------DURATION (SEC)------------- (BGIN) (COMT) (ENDJ) (ABRT) LOW HIGH MEAN MEDIAN mm/dd/yy hh:mm ONL 18 53 12 6 * 0.04 88,285.96 5,152.66 0.15 mm/dd/yy hh:mm BTC 6 0 6 0 * 8.65 78.83 41.23 60.78 TOT 24 53 18 6 24 0.04 88,285.96 3,874.80 * MAXIMUM CONCURRENT RUN UNITS = 2 mm/dd/yy hh:mm BTC 4 0 4 0 5 9.34 73.64 47.57 73.18 mm/dd/yy hh:mm MAXIMUM CONCURRENT RUN UNITS = 2 mm/dd/yy hh:mm ONL 1 25 0 1 1 18,096.92 18,096.92 18,096.92 18,096.92 mm/dd/yy hh:mm MAXIMUM CONCURRENT RUN UNITS = 1 mm/dd/yy hh:mm ONL 1 9 0 1 1 65,333.88 65,333.88 65,333.88 65,333.88 mm/dd/yy hh:mm MAXIMUM CONCURRENT RUN UNITS = 1 mm/dd/yy hh:mm BTC 1 0 1 0 2 1.80 1.80 1.80 1.80 mm/dd/yy hh:mm MAXIMUM CONCURRENT RUN UNITS = 2 mm/dd/yy hh:mm ONL 1 20 0 1 1 2,491.42 2,491.42 2,491.42 2,491.42 mm/dd/yy hh:mm MAXIMUM CONCURRENT RUN UNITS = 1 mm/dd/yy hh:mm ONL 1 2 1 0 1 81,644.72 81,644.72 81,644.72 81,644.72 mm/dd/yy hh:mm MAXIMUM CONCURRENT RUN UNITS = 1 mm/dd/yy hh:mm BTC 2 0 2 0 3 9.53 78.43 43.98 78.43 mm/dd/yy hh:mm MAXIMUM CONCURRENT RUN UNITS = 2 mm/dd/yy hh:mm ONL 5 0 5 0 6 0.22 3.95 1.47 0.68 mm/dd/yy hh:mm MAXIMUM CONCURRENT RUN UNITS = 2 mm/dd/yy hh:mm BTC 1 0 1 0 2 10.40 10.40 10.40 10.40 mm/dd/yy hh:mm MAXIMUM CONCURRENT RUN UNITS = 2 *GRAND TOTALS* mm/dd/yy hh:mm ONL 27 109 18 9 * 0.04 88,285.96 9,641.56 * mm/dd/yy hh:mm BTC 14 0 14 0 * 1.80 78.83 36.70 * TOT 41 109 32 9 41 0.04 88,285.96 6,361.85 * MAXIMUM CONCURRENT RUN UNITS = 2
|
Copyright © 2014 CA.
All rights reserved.
|
|