When you want to change a trace option, you do not need to remove the trace before entering the new option on the Build Trace Code screen. For example, if a process was traced using the Define Subroutine option (D), you can then access the Build Trace Code screen and enter an A for Trace All with Control. CA ADS Trace removes the old trace and applies the new one.
|
Copyright © 2013 CA.
All rights reserved.
|
|