The Sprints tree provides an overview of the status of the selected sprint from an SCM package perspective. Configure the SCM Project Lifecycle so that it can determine whether a package can be considered in the Implementation, QA, or Completed category. Every package associated with a user story or task of a given sprint is grouped into one of these three categories. In this way, you can determine the status of the sprint from an SCM perspective.
|
Copyright © 2013 CA.
All rights reserved.
|
|