At this point in a typical development project you would have a very large, nicely bound Requirements Specification document and probably another equally nice Detailed Design document. You would then turn these over to a horde of programmers who would start writing the source code necessary to meet the Design. In addition, with any luck at all, it would be months until the written code adhered to the Detailed Design document and the Detailed Design fully encompassed the stated Requirements.
At this same point in an CA Gen project, however, we are almost done. In addition, since the Procedures have implemented the Processes, and the Processes contain our Business Requirements, you can be assured that the generated code will adhere to those Requirements.
All we have to do now is push the big red generate button.
|
Copyright © 2013 CA.
All rights reserved.
|
|