Subsetting usage varies across the life cycle of a typical CA Gen project. This graph shows a rough approximation of the differences among the stages of the project. However, the high-level usage actually be several times the medium level of usage.
Procedure Action Diagram building and Construction are the most subsetting-intensive phases for a project because of the variety of subsets and the volume of subsetting and other Host Encyclopedia activity.
|
Copyright © 2015 CA Technologies.
All rights reserved.
|
|