

Intelligent Regeneration › Prerequisites
Prerequisites
Intelligent Regeneration evaluates only packaged load modules. To use Intelligent Regeneration, complete the following steps:
- Created a model using the workstation toolsets
- Performed Transformation or Retransformation (in Design) and completed the Data Store List and Data Structure List
- Uploaded the model to the Host Encyclopedia
- Created a business system with at least one procedure step
- Packaged for at least one procedure
Copyright © 2015 CA Technologies.
All rights reserved.
 
|
|