

System Generation and Installation › Installation on z/OS Platform › Prerequisite Workstation Tasks
Prerequisite Workstation Tasks
Complete certain tasks on the workstation and on the host before generating a system. Although create the DB2 tables before installing a system, you can generate a system without creating the DB2 tables.
Before generating a system, complete these workstation tasks:
- Complete all diagrams for the part of the model to generate.
- Perform Transformation of the Data Model (DM) using the Design toolset to create the Data Structure List and Data Store List.
- Package the server load modules for client/server applications.
- Perform a Consistency Check to ensure that the Data Model and the Technical Design are consistent.
- Upload the model to the Host Encyclopedia.
Copyright © 2015 CA Technologies.
All rights reserved.
 
|
|