Use the Scheduled Distribution feature to control report production. This feature can control a document distribution based on the day of a week.
Business Value:
Customers requiring printed or emailed output based on a particular distribution ID can specify which days of the week reports are to be sent. This can reduce report distribution and printing costs by eliminating unnecessary or redundant production work.
Additional Considerations:
A DAYS field has been added to the distribution specifications to identify the days of week that the recipient is to receive output. The default is Y (yes); the recipient receives a new report each day of the week. The field can be set to Y (yes) or N (no) for each day of the week from Monday to Sunday. The DAYS field can be specified on the Report Definition Attribute Distribution Specification panel and the Distribution List Distribution Specifications pane.
|
Copyright © 2015 CA Technologies.
All rights reserved.
|
|