This list describes the fields on the Active Report List (1) panel.
Identifies the bundle
The time remaining in the current interval
Indicates whether the bundle is to be held for production (until the interval or late time is expired) or produced as soon as the reports in the bundle are ready
YES—The bundle is held for production
Blank—The bundle is produced as soon as the reports are ready
The status of the bundle:
Blank—The bundle has not been created
OPEN—The bundle is open and is being created
PRT REQ—The bundle has been manually selected for printing with the Print Bundle Now tabular command P
QUEUED—The bundle is closed and is queued for print processing
Indicates whether an exception has occurred for a report:
Blank—No exceptions exist for the bundle
ABEND—The job that created the bundle ended abnormally
INCMP—The bundle was printed before all the active reports that it was to contain were created
NPROD—The bundle consists entirely of reports that were not produced
READY—The bundle is ready for printing
READY is displayed only when bundle confirmation is on.
Copyright © 2013 CA.
All rights reserved.
|
|