For this table, assume that all URTs are UNOPENED, and all CONNECTIONs are MUFs and UNCONNECTED. Also assume the transaction is not a DBOC/DBEC OPEN URT. An application request (implicit OPEN) then drives the OPENs/CONNECTs in the following manner:
|
PLT CONNECT |
AUTO CONNECT |
DEFER CONNECT |
---|---|---|---|
PLT URT |
drive a CONNECT drive an OPEN URT |
drive a CONNECT drive an OPEN URT |
would not CONNECT would not OPEN URT |
AUTO URT |
drive a CONNECT drive an OPEN URT |
drive a CONNECT drive an OPEN URT |
would not CONNECT would not OPEN URT |
DEFER URT |
would not CONNECT would not OPEN URT |
would not CONNECT would not OPEN URT |
would not CONNECT would not OPEN URT |
Note: All implicit CONNECTs drive OPENs for all PLT URTs for that specific CONNECTION.
Copyright © 2015 CA Technologies.
All rights reserved.
|
|